Moulding

The molding capacity of Chorka is 7000 pieces/day for Foam Molding and 15,000 pieces/day for Fabric Molding. Fabric, Lace and Foam Lamination facility is also available and the lamination capacity is 30,000 pieces/day.


Name of the machinery used for Production

Machine Type

Country of Origin

Quantity

Fabric Molding

China

8

Foam Molding

China

6

Laminating Machine

China

1

Bow Machine

Spain

1

Vacuum Plastic Absorbing Machine

China

1

Current Production Capacity

Fabric Molding

Foam Molding

15000 Pair/day

7000 Pair/day